Discussion Forum: Catalog Requests: Message 1317657
 Previous Message   Next Message 
 Author: Niels_T View Messages Posted By Niels_T
 Posted: Dec 9, 2021 06:14
 Subject: Change inventory 1211-1
 Viewed: 57 times
 Topic: Catalog Requests
 For:Inventories Administrator
 Status:Completed
Cancel Message
Cancel
Reply to Message
Reply
BrickLink
ID Card

Niels_T (1184)

Location:  Denmark
Member Since Contact Type Status
Jan 15, 2014 Contact Member Seller
Buying Privileges - OKSelling Privileges - OK
Store: BrickaLick
I just add the instructions for set 1211-2

In the text to the left it says You can build this (pitures to the right) from
content of box.

In the pictures to the right, there are 2 different kind of builds, and the build
on top fits the current BL inventory.

But the build below You can clearly see that drawing marked 1 contains 2 pcs
of 31ac01 Red Window 1 x 3 x 2 with Extended Lip and Solid Studs, with Fixed
Glass.
And also have as alternate 2 pcs of 31c Red Window 1 x 3 x 2, without Glass for
Slotted Bricks OR 2 pcs of 31bc01 Red Window 1 x 3 x 2 with Extended Lip, with
Glass.

The bottom drawing also show that 2 pcs of 3005 White Brick 1 x 1 more are needed.
1 on each side of the 1x6 and 1 by the door.

But no indication of the same applies for later set 211-1.
 

Message Has 1 Reply:

View Thread Re: Change inventory 1211-1 - Turez (43)
[...] This has been completed: (URL) Thanks for the instructions scan and please let me know if you think there is still anything wrong.
(30 months ago, Dec 10, 2021, to Catalog Requests)

3 Messages in this Thread:

 Msg 1 « - Niels_T (1184) 30 months ago Dec 9, 2021 to Catalog Requests
 Msg 2 - Turez (43) 30 months ago Dec 10, 2021 to Catalog Requests
 Msg 3 - Niels_T (1184) 30 months ago Dec 16, 2021 to Catalog Requests

 Previous Message   Next Message 

Entire thread on one page
This message and all its replies on one page

This message was moved from Inventories to Catalog Requests on Dec 9, 2021 by randyf (442)
The status of this message was changed from Open to Completed on Dec 10, 2021